![]() |
||
|
|
NEWS |
||||||
| 24-Oct-11 | ||||||
|
Newaygo Area District Library The project consists of a major renovation of the 2 story, 3,500 sq. ft., 1914 Carnegie Library Building, along with 7,500 sq. ft. of additions, which will also connect the existing City Hall with the updated Library. The Library will receive major upgrades to all mechanical, electrical, and plumbing systems as well as aesthetic improvements to the existing façade and a completely new floor plan. While respecting existing components, such as the original tin ceilings, Sidock’s work will result in a new state of the art Library facility for the Newaygo County area. |
||||||
|
|
||||||
| 24-Oct-11 | ||||||
|
Consumers Energy Sidock Group has been selected by Consumers Energy to provide design and engineering services for the $9,000,000 major upgrade to the Royal Oak Service Center, in Royal Oak, Michigan. The project consists of a complete gut and re-model of the 133,000, two story, Service Center, following LEED 3.0 standards. Scope of services includes complete re-design of the facility, including new office areas, business centers, fitness facility, team areas, workshop areas and garage, and exterior upgrades. The facility will receive all new mechanical, electrical, and plumbing systems in addition to new cranes in the garage areas. We are very pleased that our partnership with Consumers Energy continues to grow and look forward to completing this very challenging project with them. |
||||||
|
|
||||||
| 15-Oct-11 | ||||||
|
Rolling
Hills Water Park The project consists of re-design of the parking area and creation of a Promenade to connect with the rest of the Park, Adaptive re-use of the existing entry/bathhouse building, creations of a new 6,000 sq. ft. bathhouse/administrative office building, addition of a new spray/play feature with dump bucket, a new large major thrill slide complex, provisions for an additional bowl slide feature, and numerous new site amenities. Sidock Group and our Partner, WTI, are very excited to have been selected as the Counties Architect/Engineer for this project, which is scheduled for grand opening on Memorial Day 2013. |
||||||
|
|
||||||
| 15-Oct-11 | ||||||
|
Josephine Ford Cancer Center The $2,000,000 project will include an expanded chemotherapy treatment area, new staff offices, conferencing center, and multi-use rooms, in addition to renovations to approximately 60% of the existing facility. Site upgrades will include new parking areas and a new storm water detention system, that will utilize bio-swales. Wilkie + Zanley, and Sidock Group, look forward to continuing our successful partnership with Henry Ford Health, and the Josephine Ford Cancer Center. |
||||||
|
|
||||||
| 15-Oct-11 | ||||||
|
Our Lady of
Sorrows Catholic Church The project will be designed around the existing outdoor fountain and 30’ high aluminum cross at the main church entrance and will include a new glass roof, new glass curtain wall, new restroom facilities, and new HVAC/plumbing/electrical services. |
||||||
|
|
||||||
| Fall 2011 | ||||||
P.E.
Licensing & STI Inspection Certification We are very pleased to announce that Kevin Hirzel, Ryan Jakel and Casey Leach have all passed their P.E. exam and are now licensed Civil/Structural Engineers. We are also very pleased to announce that Casey Leach and Dan Azarovitz have recently completed training to become certified Level 1 and Level 2 STI (Steel Tank Institute) Inspectors. Congratulations to everyone! |
||||||
|
|
||||||
01-Aug-11 |
||||||
Medical
Office Building Sidock Group was recently selected to perform design and engineering for a new 20,000 sq. ft. Medical Office Building in Lenox Township, Michigan. The facility, which is a partnership between North Medical Associates and McClaren Hospital, contains an MRI Suite, CT/Radiology Suite, Diagnostics Suite, Physical Therapy Suite and a Family Practice Suite. Sidock is completing this project in partnership with Schonsheck Construction. |
||||||
|
|
||||||
04-Jul-11 |
||||||
Volt Battery
Plant Expansion Sidock Group has recently completed design and engineering for the Phase III Volt Battery Expansion in Brownstown, Michigan for General Motors Subsystems LLC. This 224,000 sq. ft. expansion contains manufacturing space as well as a 12,000 sq. ft. 2 story office area. This Project Team includes Sidock Group, General Motors, Ashley Capital and Oliver Hatcher Construction. |
||||||
|
|
||||||
27-Jun-11 |
||||||
fortu PowerCell Inc.
Sidock Group Inc. is serving as project manager and engineer for the 168,000-square foot, anticipated LEED-certified facility, set to be built on 11.5 acres on property fortu purchased from Bayer CropScience.
Read the
entire article from MiBiz here:
Battery
maker fortu's plans moving ahead |
||||||
|
|
||||||
15-Apr-11 |
||||||
MTU/Detroit
Diesel manufacturing facility Sidock Group recently completed design and engineering for the build-out of the MTU/Detroit Diesel manufacturing facility in Brownstown, Michigan. This 400,000 sq. ft. facility consists of manufacturing space, automated storage and retrieval system, carpentry shop area and offices. Sidock completed this project in partnership with Oliver Hatcher Construction. |
||||||
|
|
||||||
01-Jan-11 |
||||||
New
headquarters building for Sidock Group, Inc.
Sidock Group, Inc. has recently moved into their new headquarters in Novi, Michigan. Sidock Group did a complete gut and renovation of the existing 2-story, 16,000 sq. ft. Flaviani Building. Sidock officially moved in on Nov. 1st, 2010.
|
||||||
|
|
||||||
14-May-09 |
||||||
LEED AP Certification We are very pleased and excited to announce that Dave Zanley, AIA and Lisa Abraham have obtained LEED AP certification. Coupled with our membership in the USGBC, Dave and Lisa's certification, along with Heather Caputo's, further strengthens Sidock's ability to offer our clients environmentally sound designs and solutions. Congratulations to Dave and Lisa on their very important achievement. |
||||||
|
|
||||||
30-Oct-08 |
||||||
Sidock Group has added Wilkie & Zanley,
Architects to our group of companies
Sidock Group is pleased to announce that we have recently added Wilkie & Zanley, Architects to our group of companies. Founded in 1955, Wilkie & Zanley is an award winning firm reknown for its excellent work in the downriver communities. The addition of Wilkie & Zanley will allow us to provide even greater depth of service for our architectural Clients.
Visit
the current Wilkie & Zanley, Architects website:
www.wilkie-zanley.com
|
||||||
|
|
||||||
28-Oct-08 |
||||||
Sidock Moves In Pretty much everyone has a good idea of what the Sidock building looks like from the outside. Under construction for more than a year right at the round an about, it would be rather hard to miss. But last week the 20 local employees moved in allowing a peek at the tastefully done interior. Muskegon Main Street caught up with Tom Winer, Senior Project Manager to hear about how the move went and how the folks are liking their new digs. |
||||||
|
|
||||||
23-Oct-08 |
||||||
$2.3M Sidock Building latest of "great new buildings" in downtown
Muskegon
After 14 months of construction, the $2.3 million Sidock Building has opened its doors in downtown Muskegon, the latest new structure on the former Muskegon Mall site.
“Since
Sidock Group is an architectural and engineering firm, we wanted a
presence downtown that could show off what we can do with our designs,”
says Heather Caputo, Sidock spokesperson. “The company’s owner, Bill
Sidock, wanted to invest in downtown Muskegon. He’s from the area and he
saw an opportunity with all of these great new buildings going in
downtown.” |
||||||
|
02-Aug-08 |
||||||
|
Sidock Group, Inc. hosts its 4th
annual company golf outing |
||||||
|
|
||||||
08-May-08 |
||||||
LEED AP Certification We are very pleased and excited to announce that Heather Caputo has obtained LEED AP certification. Coupled with our membership in the USGBC, Heather's certification further strengthens Sidock's ability to offer our clients environmentally sound designs and solutions. Congratulations to Heather on her very important achievement. |
||||||
|
|
||||||
15-Apr-08 |
||||||
Sidock Group Goes Green!
We are pleased to announce that Sidock Group is now an official member of the U.S. Green Building Council. This membership is part of Sidock's ongoing efforts to be pro-active in providing our Clients with cutting edge services and building technology and in doing our part to design and engineer cost effective environmentally responsible solutions. As part of our overall effort, 5 of our architects and engineers are currently preparing to achieve LEED AP Certification status. ![]() |
||||||
|
|
||||||
08-Apr-08 |
||||||
Sidock Group has added Muskegon Valve
Company to our Sidock Systems Subsidiary
Sidock Group is pleased to announce that we have recently added Muskegon Valve Company to our Sidock Systems Subsidiary. Founded in 1912, Muskegon Valve is a leader in all areas of process valve repair, replacement, fabrication, and inspection from bronze valves to high pressure steam to food grade stainless steel. The addition of the Valve Shop, which joins our Construction Management Group and Electrical Panel and Controls Shop under the Sidock System Umbrella, will allow us to provide even greater depth of service for our process Clients. Mark Sidock will serve as General Manager for the shop whose current Client list includes Sappi Fine Paper, Sun Chemical, Federal Mogul, Georgia Pacific, and CWC Textron.
Visit
Muskegon Valve Company's website:
www.muskegonvalve.com
|
||||||
|
|
||||||
08-Apr-08 |
||||||
75+ Employees at Sidock Group, Inc. Sidock Group is pleased to announce that, with the recent addition of 8 new Team Members, we have surpassed the 75 employee level for the first time in our history! Sidock Group continues to grow and expand our service offerings in order to better serve both existing and new Clients. Jason Bettinger has joined Sidock Group as a Primavera Project Scheduler and will focus on DTE Energy projects. Jason has spent the last 7 years as a sales engineer with both Trane and Lennox. Samantha Goddard has joined Sidock Group as an Administrative Assistant. She will serve as our new receptionist as well as assist with Sidock’s marketing efforts. Christina Meisel has joined Sidock Group as a Project Engineer – Structural/Civil. Previously with both Orchard, Hiltz, & McCLiment and the Smith Group, Christina spent the last 9 years as a Project Engineer with the Natural Aggregates Division of the Edward C. Levy Company. Christina also recently passed the E.I.T. exam as the first step in becoming a licensed engineer. Christine Price has joined Sidock Group as a Project Designer – Civil. Christine previously spent the last 20 years with Warner, Cantrell, & Padmos as both a Project Designer and CAD Department Manager. Her duties at Sidock will also include assisting with CAD standards and practices. Brenda Thompson has joined Sidock Group as a Senior Project Scheduler. Most recently with Durr Systems and Daimler Chrysler’s Mopar Division, Brenda has also been with Ronnisch Construction, Walbridge Aldinger, and George W. Auch. Eric Torreano has joined Sidock Group as a Project Engineer – Mechanical. Eric spent the last 7 years at Johnson Controls in various engineering positions, and he was involved in production programs for the Jeep Grand Cherokee, Commander, Wrangler, and Liberty. Michael Schultz, P.E. has re-joined Sidock Group as a Senior Project Engineer – Structural/Civil. Following 5 years with Sidock Group in the late 90s, Mike spent the last 6 years with NTH Consultants as a Project Engineer. Mike is also a Sergeant with Farmington Hills Fire-Rescue and is a Structures Specialist with the Michigan Technical Rescue Operations Team. Paul Weise has joined Sidock Group as a Sales and Marketing specialist. Most recently with Cummins and Barnard, Paul’s long career in the engineering industry included projects with the New YorK Port Authority, Duke/Fluor Power, Northwest Airlines, General Motors, Toyota, and PG&E/Bechtel, to name a few. Paul will focus on growing our already solid business in the power, chemical, pharmaceutical, food, and paper industries. |
||||||
|
07-Aug-07 |
||||||
|
Sidock Group, Inc. hosts its 3rd
annual company golf outing |
||||||
|
|
||||||
07-Aug-07 |
||||||
4
new hires in Sidock Group's West Michigan office Sidock Group is pleased to announce that Heather N. Caputo has joined our Muskegon, Michigan office as an Intern Architect. Heather joins Sidock from Greenberg Farrow in New York, where she worked on numerous mixed use urban retail projects such as the 60 story 1.5 million sq. ft. Albee square project in Brooklyn and the 4 story 1 million sq. ft. Gateway Center at the Bronx Terminal Market in New York. She has also worked on a number of educational and civic projects with a small Maryland Firm and received her Master of Architecture from the Savannah College of Art and Design in Savannah, Georgia. An extremely talented designer, with strong intrapersonal skills, Heather will be an invaluable addition to Sidock Group and will assist with the future growth of our Architectural Group. Sidock Group is pleased to announce that Stephen R. Sheets, P.E. has joined our Muskegon, Michigan office as a Senior Project Engineer in our Chemical Group. Steve joins us from the Facilities Group at Shimizu America Corp. He brings a vast amount of experience to Sidock with ceramics, abrasives, chemical, and refractory plants and has worked in all aspects of project development, engineering, and construction. Steve was previously with Sidock for 5 years, and we are very pleased that he has decided to re-join us. Sidock Group is pleased to announce that Carrie L. Rivette, P.E. has joined our Muskegon, Michigan office as a Senior Project Engineer in our Environmental Group. Carrie joins us from Fleis & VandenBrink Engineering, where she was a Project Manager. She has vast experience in the environmental consulting field including, compliance assessments, site assessments, permitting and documentation, watershed issues, pollution control, etc. In addition to being a licensed Engineer, she is a State of Michigan certified UST Professional, Storm Water Operator, and Wastewater Treatment Operator, and has completed ongoing OSHA training for hazardous waste site operation. Carrie will be invaluable in helping to grow our site development consulting practice, as well as our heavy industrial group. Sidock Group is pleased to announce that Janet Murphy has joined our Muskegon, Michigan office as the Office Manager. Jan joins us from Fleis & VandenBrink Engineering, where she was the Office Manager and a Project Assistant. Jan will be a very valuable addition to our growing Muskegon Office. |
||||||
29-Jun-07 |
||||||
|
Engineering firm shows $2.1M commitment to
downtown Muskegon |
||||||
|
|
||||||
29-Jun-07 |
||||||
New Sidock Group website
Sidock Group, Inc. launches its new company website. |
||||||
|
Last Updated: 31-Oct-11 |